McMicken investigation

Background
Around 5 p.m. on April 19, 2019, there were reports of smoke from the building housing the energy storage system at APS’s McMicken site in Surprise, Ariz. Hazardous Material units and first responders arrived on scene to secure the area. Approximately three hours after the reports of smoke and shortly after the door was opened, the site experienced a catastrophic failure. Injured first responders were transported to area hospitals. A thorough investigation led by APS, with first-responder representatives, the system integrator, manufacturers and third-party engineering and safety experts, was conducted to determine the cause of the incident and identify lessons that can be applied to future battery energy storage systems.

Final report of technical investigation
Following the event in April 2019, APS immediately began a collaborative effort to determine what happened and what could be learned to prevent this type of equipment failure in the future.

The investigation involved a number of key stakeholders, and APS commissioned several forensic experts and nationally recognized research institutions. APS published regular updates on this site as the investigation progressed. Once the investigative work was completed, APS chose DNV GL, based on this firm’s reputation and experience, to combine various forensic and expert inputs into the single, consolidated report published here.

Final Report: McMicken Battery Energy Storage System Technical Analysis and Recommendations (July 27, 2020)

Equipment at McMicken center.
McMicken battery facts
Location: Surprise, Arizona, near the APS McMicken substation (28 miles northwest of downtown Phoenix)
Technology: Lithium-ion battery
Capacity: 2 megawatts/2 megawatt-hours
System integrator: Fluence
In-service date: March 2017
Primary functions: Integrating solar energy resources in an area with high rooftop solar penetration, and grid services including voltage regulation and power quality.

Additional resources
APS clean energy commitment: Goal to achieve 100% carbon-free energy by 2050
News release (Feb. 21, 2019): APS customers get solar after sunset with major clean-energy projects

Related stories

10/26/2023
Key Supplier Awards recognize outstanding partners
8/4/2023
Solar after Sunset Arrives in the Arizona Desert
7/6/2023
More clean energy for APS customers: what to know and why it matters