Redhawk Power Plant Expansion Project
aps
Location: Arlington, AZ
Estimated Completion Date: Spring 2028
Project description
APS proposes to expand its existing Redhawk Power Plant. The expansion includes the addition of eight new natural gas units, adding up to 397 megawatts (MW) to the energy grid by 2028 – enough to serve 63,520 Arizona homes.
Project need
There is significant growth in demand for energy in our service territory, and we are preparing to meet nearly 40% load growth by 2031. These new units will provide much-needed energy during the late-afternoon and evening hours, when customer energy use is highest. We are committed to providing reliable and affordable service and use a rigorous selection process and detailed analysis to determine the best combination of resources to serve customers. Our natural gas fleet is an important part of a diverse energy mix and a critical partner to the large quantities of solar and battery energy storage we’re adding to our system.
These new units are necessary to support the reliable service our customers count on. Modern natural gas units, like those planned for this location, provide flexible, on-demand energy when customers need it most.
The Redhawk Power Plant is a key component of our energy infrastructure. Adding additional units at Redhawk maximizes the current infrastructure and gas pipeline capacity to generate reliable energy for Arizona.
Arizona Power Plant and Transmission Line Siting Committee Hearing
APS must secure a Certificate of Environmental Compatibility (CEC) from the Arizona Corporation Commission (ACC) before constructing the proposed eight new natural gas units. APS’s CEC application will be reviewed by the Arizona Power Plant and Transmission Line Siting Committee in a public hearing scheduled to begin on Monday, August 19, 2024, at the Hampton Inn & Suites, 2000 N. Litchfield Road, Goodyear, Arizona.
Watch the hearing virtually: (link will be posted once available)
To provide comment:
Public comment will be taken in a special evening session on August 19, 2024, beginning at 5:30 p.m., virtually or in person.- A link to join the hearing virtually, and a phone number to call in, will be included on this page once available.
- In Person: The Hampton Inn & Suites, 2000 N. Litchfield Road, Goodyear, AZ 85395 (map)
The hearing will continue through Friday, August 23, 2024, as necessary, starting daily at 9 a.m. Public comment may also be taken at the beginning of each hearing day, or at other times of the hearing, at the discretion of the committee chairman.
Project Applications and Documents
CEC Application (66.7MB PDF)
Transcripts and Exhibits
Project Vicinity
Public open house
The Redhawk Power Plant Expansion Project public open house was held on June 6, 2024. View the open house display boards here. (25.1 MB PDF)
Virtual open house
You can attend our virtual open house at any time online to learn more about the project: www.apsredhawkproject.com.
You can submit questions/comments about the project by phone at (800) 484-1358 or email to apsredhawkproject@aps.com.